A pre-timed four phase signal has critical lane flow rate for the first three phases as $200$, $187$ and $210$ veh/hr with saturation flow rate of $1800$ veh/hr/lane for al phases. The lost time is given as $4$ seconds for each phase. If the cycle length is $60$ seconds, the effective green time (in seconds) of the fourth phase is ________