Most answered questions in Construction Materials and Management
0
votes
1
answer
1
GATE2017 CE-2-3
Given that the scope of the construction work is well-defined with all its drawings, specifications, quantities and estimates, which one of the following of contract would be most preferred? EPC contract percentage rate contract Item rate contract Lump sum contract
Given that the scope of the construction work is well-defined with all its drawings, specifications, quantities and estimates, which one of the following of contract woul...
gatecse
4.0k
points
gatecse
asked
Aug 7, 2019
Construction Materials and Management
gate2017-ce-2
construction-materials-and-management
structural-engineering
contracts
cost-estimation
+
–
0
votes
1
answer
2
GATE2018 CE-2: 50
A coal containing $2 \%$ sulfur is burned completely to ash in a brick kiln at a rate of $30$ kg/min. The sulfur content in the ash was found to be $6 \%$ of the initial amount of sulfur present in the coal fed to the brick kiln. The ... /mole, respectively. The annual rate of sulfur dioxide $(SO_2)$ emission from the kiln (in tonnes/year, up to two decimal places) is ________
A coal containing $2 \%$ sulfur is burned completely to ash in a brick kiln at a rate of $30$ kg/min. The sulfur content in the ash was found to be $6 \%$ of the initial ...
gatecse
4.0k
points
gatecse
asked
Feb 17, 2018
Construction Materials and Management
gate2018-ce-2
numerical-answers
construction-materials-and-management
structural-engineering
bricks
+
–
0
votes
0
answers
3
GATE Civil 2021 Set 2 | Question: 8
Seasoning of timber for use in construction is done essentially to increase strength and durability smoothen timber surfaces remove knots from timber logs cut timber in right season and geometry
Seasoning of timber for use in construction is done essentially toincrease strength and durabilitysmoothen timber surfacesremove knots from timber logscut timber in right...
go_editor
5.3k
points
go_editor
asked
Mar 1, 2021
Construction Materials and Management
gatecivil-2021-set2
construction-materials
material-behavior-and-properties
timber
+
–
0
votes
0
answers
4
GATE Civil 2021 Set 2 | Question: 9
In case of bids in Two-Envelop System, the correct option is Technical bid is opened first Financial bid is opened first Both (Technical and Financial) bids are opened simultaneously Either of the two (Technical and Financial) bids can be opened first
In case of bids in Two-Envelop System, the correct option isTechnical bid is opened firstFinancial bid is opened firstBoth (Technical and Financial) bids are opened simul...
go_editor
5.3k
points
go_editor
asked
Mar 1, 2021
Construction Materials and Management
gatecivil-2021-set2
construction-management
bidding
+
–
0
votes
0
answers
5
GATE Civil 2021 Set 2 | Question: 42
The activity details for a small project are given in the Table. ... $\text{days}, \textit{in integer}$) for project completion is __________________________
The activity details for a small project are given in the Table.$$\begin{array}{|cl|cI|cI|}\hline&\textbf{Activity} & \textbf{Duration (days)} & \textbf{Depends on} \\ \h...
go_editor
5.3k
points
go_editor
asked
Mar 1, 2021
Construction Materials and Management
gatecivil-2021-set2
numerical-answers
construction-management
project-planning
+
–
0
votes
0
answers
6
GATE Civil 2021 Set 2 | Question: 43
An equipment has been purchased at an initial cost of $₹ 160000$ and has an estimated salvage value of $₹ 10000$. The equipment has an estimated life of $5$ years. The difference between the book values (in ₹, $\textit{in integer}$) ... at the end of $4^{\text{th}}$ year using straight line method and sum of years digit method of depreciation is______________
An equipment has been purchased at an initial cost of $₹ 160000$ and has an estimated salvage value of $₹ 10000$. The equipment has an estimated life of $5$ years. Th...
go_editor
5.3k
points
go_editor
asked
Mar 1, 2021
Construction Materials and Management
gatecivil-2021-set2
numerical-answers
cost-estimation
+
–
0
votes
0
answers
7
GATE Civil 2021 Set 1 | Question: 5
Gypsum is typically added in cement to prevent quick setting enhance hardening increase workability decrease heat of hydration
Gypsum is typically added in cement toprevent quick settingenhance hardeningincrease workabilitydecrease heat of hydration
Arjun
13.0k
points
Arjun
asked
Feb 19, 2021
Construction Materials and Management
gatecivil-2021-set1
material-behaviour
+
–
0
votes
0
answers
8
GATE Civil 2021 Set 1 | Question: 6
The direct and indirect costs estimated by a contractor for bidding a project is $₹160000$ and $₹20000$ respectively. If the mark up applied is $10\%$ of the bid price, the quoted price (in ₹) of the contractor is $200000$ $198000$ $196000$ $182000$
The direct and indirect costs estimated by a contractor for bidding a project is $₹160000$ and $₹20000$ respectively. If the mark up applied is $10\%$ of the bid pric...
Arjun
13.0k
points
Arjun
asked
Feb 19, 2021
Construction Materials and Management
gatecivil-2021-set1
construction-contracts
cost-estimation
+
–
0
votes
0
answers
9
GATE Civil 2021 Set 1 | Question: 30
Contractor $\text{X}$ is developing his bidding strategy against Contractor $\text{Y}$. The ratio of $\text{Y's}$ bid price to $\text{X's}$ cost for the $30$ previous bids in which Contractor $\text{X}$ has competed against Contractor $\text{Y}$ is given in the ... is $0\%$ more than $0\%$ but less than $50\%$ more than $50\%$ but less than $100\%$ $100\%$
Contractor $\text{X}$ is developing his bidding strategy against Contractor $\text{Y}$. The ratio of $\text{Y’s}$ bid price to $\text{X’s}$ cost for the $30$ previous...
Arjun
13.0k
points
Arjun
asked
Feb 19, 2021
Construction Materials and Management
gatecivil-2021-set1
construction-management
bidding
+
–
0
votes
0
answers
10
GATE2020-CE-1-6
A reinforcing steel bar, partially embedded in concrete, is subjected to a tensile force $P$. The figure that appropriately represents the distribution of the magnitude of bond stress (represented as hatched region), along the embedded length of the bar, is
A reinforcing steel bar, partially embedded in concrete, is subjected to a tensile force $P$. The figure that appropriately represents the distribution of the magnitude o...
go_editor
5.3k
points
go_editor
asked
Feb 27, 2020
Construction Materials and Management
gate2020-ce-1
structural-steel-composition
reinforced-steel
+
–
0
votes
0
answers
11
GATE2020-CE-1-8
During the process of hydration of cement, due to increase in Dicalcium Silicate $(C_2S)$ content in cement clinker, the heat of hydration increases decreases initially decreases and then increases does not change
During the process of hydration of cement, due to increase in Dicalcium Silicate $(C_2S)$ content in cement clinker, the heat of hydrationincreasesdecreasesinitially decr...
go_editor
5.3k
points
go_editor
asked
Feb 27, 2020
Construction Materials and Management
gate2020-ce-1
concrete-mix-design
cement-properties
clinker
+
–
0
votes
0
answers
12
GATE2020 CE-2-8
As per $IS\:456:2000$, the $pH$ value of water for concrete mix shall NOT be less than $4.5$ $5.0$ $5.5$ $6.0$
As per $IS\:456:2000$, the $pH$ value of water for concrete mix shall NOT be less than$4.5$$5.0$$5.5$$6.0$
go_editor
5.3k
points
go_editor
asked
Feb 13, 2020
Construction Materials and Management
gate2020-ce-2
construction-materials-and-management
concrete-mix-design
+
–
0
votes
0
answers
13
GATE2017 CE-2-15
Let the characteristic strength be defined as that value, below which not more than $50 \%$ of the results are expected to fall. Assuming a standard deviation of $4$ MPa, the target mean strength (in MPa) to be considered in the mix design of a $M25$ concrete would be $18.42$ $21.00$ $25.00$ $31.58$
Let the characteristic strength be defined as that value, below which not more than $50 \%$ of the results are expected to fall. Assuming a standard deviation of $4$ MPa,...
gatecse
4.0k
points
gatecse
asked
Aug 7, 2019
Construction Materials and Management
gate2017-ce-2
construction-materials-and-management
structural-engineering
concrete-mix-design
+
–
0
votes
0
answers
14
GATE2017 CE-2-18
For a construction project, the mean and standard deviation of the completion time are $200$ days and $6.1$ days, respectively. Assume normal distribution and use the value of standard normal deviate $z = 1.64$ for the $95 \%$ confidence level. The maximum time required (in days) for the completion of the project would be ________
For a construction project, the mean and standard deviation of the completion time are $200$ days and $6.1$ days, respectively. Assume normal distribution and use the val...
gatecse
4.0k
points
gatecse
asked
Aug 7, 2019
Construction Materials and Management
gate2017-ce-2
numerical-answers
construction-materials-and-management
structural-engineering
construction-project
+
–
0
votes
0
answers
15
GATE2017 CE-2-30
Group I gives a list of test methods and test apparatus for evaluating some of the properties of Ordinary Portland Cement (OPC) and concrete. Group II gives the list of these properties. ... $P - 4; Q - 2; R - 4; S - 1$ $P - 1; Q - 4; R - 2; S - 3$
Group I gives a list of test methods and test apparatus for evaluating some of the properties of Ordinary Portland Cement (OPC) and concrete. Group II gives the list of t...
gatecse
4.0k
points
gatecse
asked
Aug 7, 2019
Construction Materials and Management
gate2017-ce-2
structural-engineering
construction-materials-and-management
concrete-constituents--mix-design
+
–
0
votes
0
answers
16
GATE2017 CE-2-33
Consider the following statements: Walls of one brick thick are measured in square meters Walls of one brick thick are measured in cubic meters No deduction in the brickwork quantity is made for openings in walls up to $0.1 \: m^2$ area. For the measurement of excavation from the borrow pit ... False P - True, Q - False, R - True, S - False P - True, Q - False, R - True, S - True
Consider the following statements:Walls of one brick thick are measured in square metersWalls of one brick thick are measured in cubic metersNo deduction in the brickwork...
gatecse
4.0k
points
gatecse
asked
Aug 7, 2019
Construction Materials and Management
gate2017-ce-2
construction-materials-and-management
structural-engineering
bricks
+
–
0
votes
0
answers
17
GATE2019 CE-1: 37
The network of a small construction project awarded to a contractor is shown in the following figure. The normal duration, crash duration, normal cost, and crash cost of all the activities are shown in the table. The indirect cost incurred by the contractor is ... is targeted for completion in $16$ days, the total cost (in INR) to be incurred by the contractor would be _______
The network of a small construction project awarded to a contractor is shown in the following figure. The normal duration, crash duration, normal cost, and crash cost of ...
Arjun
13.0k
points
Arjun
asked
Feb 14, 2019
Construction Materials and Management
gate2019-ce-1
numerical-answers
construction-materials-and-management
structural-engineering
types-of-construction-projects
cost-estimation
+
–
0
votes
0
answers
18
GATE2019 CE-2: 7
If the fineness modulus of a sample of fine aggregates is $4.3$, the mean size of the particles in the sample is between $150 \: \mu m$ and $300 \: \mu m$ $300 \: \mu m$ and $600 \: \mu m$ $1.18 \: mm$ and $2.36 \: mm$ $2.36 \: mm$ and $4.75\: mm$
If the fineness modulus of a sample of fine aggregates is $4.3$, the mean size of the particles in the sample is between$150 \: \mu m$ and $300 \: \mu m$$300 \: \mu m$ an...
Arjun
13.0k
points
Arjun
asked
Feb 12, 2019
Construction Materials and Management
gate2019-ce-2
structural-engineering
construction-materials-and-management
material-behavior-and-properties
+
–
0
votes
0
answers
19
GATE2019 CE-2: 21
The characteristic compressive strength of concrete required in a project is $25 \: MPa$ and the standard deviation in the observed compressive strength expected at site is $4 \: MPa$. The average compressive strength of cubes tested at different water-cement (w/c) ... The water-cement ratio (in percent, round off to the lower integer) to be used in the mix is ______
The characteristic compressive strength of concrete required in a project is $25 \: MPa$ and the standard deviation in the observed compressive strength expected at site ...
Arjun
13.0k
points
Arjun
asked
Feb 12, 2019
Construction Materials and Management
gate2019-ce-2
numerical-answers
construction-materials-and-management
structural-engineering
concrete-mix-design
+
–
0
votes
0
answers
20
GATE2016-2-9
As per Indian standards for bricks, minimum acceptable compressive strength of any class of burnt clay bricks in dry state is $10.0 \text{ MPa}$ $7.5 \text{ MPa}$ $5.0 \text{ MPa}$ $3.5 \text{ MPa}$
As per Indian standards for bricks, minimum acceptable compressive strength of any class of burnt clay bricks in dry state is$10.0 \text{ MPa}$$7.5 \text{ MPa}$$5.0 \text...
Milicevic3306
11.9k
points
Milicevic3306
asked
Mar 27, 2018
Construction Materials and Management
gate2016-ce-2
construction-materials-and-management
structural-engineering
bricks
+
–
0
votes
0
answers
21
GATE2016-2-10
A construction project consists of twelve activities. The estimated duration (in days) required to complete each of the activities along with the corresponding network diagram is shown below. ... $11-12$ for the project are, respectively, $25$ and $1$ $1$ nd $1$ $0$ and $0$ $81$ and $0$
A construction project consists of twelve activities. The estimated duration (in days) required to complete each of the activities along with the corresponding network di...
Milicevic3306
11.9k
points
Milicevic3306
asked
Mar 27, 2018
Construction Materials and Management
gate2016-ce-2
construction-materials-and-management
structural-engineering
project-planning-and-network-analysis
cost-estimation
+
–
0
votes
0
answers
22
GATE2016-2-39
The activity-on-arrow network of activities for a construction project is shown in the figure. The durations (expressed in days) of the activities are mentioned below in arrows. The critical duration for this construction project is $13$ days $14$ days $15$ days $16$ days
The activity-on-arrow network of activities for a construction project is shown in the figure. The durations (expressed in days) of the activities are mentioned below in ...
Milicevic3306
11.9k
points
Milicevic3306
asked
Mar 27, 2018
Construction Materials and Management
gate2016-ce-2
construction-materials-and-management
structural-engineering
project-planning-and-network-analysis
+
–
0
votes
0
answers
23
GATE2016-1-9
Bull’s trench kiln is used in the manufacturing of lime cement bricks none of these
Bull’s trench kiln is used in the manufacturing oflimecementbricksnone of these
Milicevic3306
11.9k
points
Milicevic3306
asked
Mar 27, 2018
Construction Materials and Management
gate2016-ce-1
bulls-trench-kiln
structural-engineering
construction-materials-and-management
construction-materials
+
–
0
votes
0
answers
24
GATE2016-1-10
The compound which is largely responsible for initial setting and early strength gain of Ordinary Portland Cement is $C_3A$ $C_3S$ $C_2S$ $C_4AF$
The compound which is largely responsible for initial setting and early strength gain of Ordinary Portland Cement is$C_3A$$C_3S$$C_2S$$C_4AF$
Milicevic3306
11.9k
points
Milicevic3306
asked
Mar 27, 2018
Construction Materials and Management
gate2016-ce-1
structural-engineering
construction-materials-and-management
concrete-constituents-mix-design
+
–
0
votes
0
answers
25
GATE2016-1-39
The Optimistic Time (O), Most likely Time (M) and Pessimistic Time (P) (in days) of the activities in the critical path are given below in the format O – M – P. The expected completion time (in days) of the project is ________
The Optimistic Time (O), Most likely Time (M) and Pessimistic Time (P) (in days) of the activities in the critical path are given below in the format O – M – P.The ex...
Milicevic3306
11.9k
points
Milicevic3306
asked
Mar 27, 2018
Construction Materials and Management
gate2016-ce-1
numerical-answers
structural-engineering
construction-materials-and-management
project-planning-and-network-analysis
+
–
0
votes
0
answers
26
GATE2017 CE-1: 45
The activity details of a project are given below: ... The estimated minimum time (in days) for the completion of the project will be __________
The activity details of a project are given below:$$\begin{array}{|c|c|c|} \hline \text{Activity} & \text{Depends on} & \text{Duration (in days)} \\ \hline P & \dots & 6 ...
Milicevic3306
11.9k
points
Milicevic3306
asked
Mar 26, 2018
Construction Materials and Management
gate2017-ce-1
numerical-answers
construction-materials-and-management
structural-engineering
project-planning
cost-estimation
+
–
0
votes
0
answers
27
GATE2015-2-53
In Marshall method of mix design, the coarse aggregate, fine aggregate, fines and bitumen having respective values of specific gravity $2.60, 2.70, 2.65$ and $1.01$, are mixed in the relative proportions ($\%$ by weight) of $55.0, \: 35.8, \: 3.7$ and $5.5$ respectively. The ... the mix respectively are: $2.42$ and $2.63$ $2.42$ and $2.78$ $2.42$ and $2.93$ $2.64$ and $2.78$
In Marshall method of mix design, the coarse aggregate, fine aggregate, fines and bitumen having respective values of specific gravity $2.60, 2.70, 2.65$ and $1.01$, are ...
Milicevic3306
11.9k
points
Milicevic3306
asked
Mar 26, 2018
Construction Materials and Management
gate2015-ce-2
construction-materials-and-management
mix-design
marshall-method
structural-engineering
+
–
0
votes
0
answers
28
GATE2015-1-4
Workability of concrete can be measured using slump, compaction factor and Vebe time. Consider the following statements for workability of concrete. As the slump increases, the Vebe time increases As the slump increases, the compaction factor increases Which of the following is TRUE? Both (i) and ( ... (i) and (ii) are False (i) is True and (ii) is False (i) is False and (ii) is True
Workability of concrete can be measured using slump, compaction factor and Vebe time. Consider the following statements for workability of concrete.As the slump increases...
Milicevic3306
11.9k
points
Milicevic3306
asked
Mar 26, 2018
Construction Materials and Management
gate2015-ce-1
structural-engineering
construction-materials-and-management
workability-of-concrete
material-properties-and-behaviour
+
–
0
votes
0
answers
29
GATE2014-2-50
In a Marshall sample, the bulk specific gravity of mix and aggregates are $2.324$ and $2.546$ respectively. The sample includes $5 \%$ of bitumen (by total weight of mix) of specific gravity $1.10$. The theoretical maximum specific gravity of mix is $2.441$. The void filled with bitumen (VFB) in the Marshall sample (in $\%$) is _______
In a Marshall sample, the bulk specific gravity of mix and aggregates are $2.324$ and $2.546$ respectively. The sample includes $5 \%$ of bitumen (by total weight of mix)...
Milicevic3306
11.9k
points
Milicevic3306
asked
Mar 25, 2018
Construction Materials and Management
gate2014-ce-2
numerical-answers
construction-materials-and-management
structural-engineering
bitumen
marshall-sample
+
–
0
votes
0
answers
30
GATE2014-2-9
The target mean strength $f_{cm}$ for concrete mix design obtained from the characteristic strength $f_{ck}$ and standard deviation $\sigma$, as defined in $IS:456-2000$, is $f_{ck}+1.35 \sigma$ $f_{ck}+1.45 \sigma$ $f_{ck}+1.55 \sigma$ $f_{ck}+1.65 \sigma$
The target mean strength $f_{cm}$ for concrete mix design obtained from the characteristic strength $f_{ck}$ and standard deviation $\sigma$, as defined in $IS:456-2000$,...
Milicevic3306
11.9k
points
Milicevic3306
asked
Mar 25, 2018
Construction Materials and Management
gate2014-ce-2
construction-materials-and-management
structural-engineering
concrete-mix-design
+
–
0
votes
0
answers
31
GATE Civil 2013 | Question: 44
Elevation and temperature data for a place are tabulated below: $\begin{array}{|c|c|} \hline \text{Elevation, m} & \text{Temperature, } ^{\circ}C \\ \hline 4 & 21.25 \\ \hline 444 & 15.70 \\ \hline \end{array}$ Based on the above data, lapse rate can be referred as Super-adiabatic Neutral Sub-adiabatic Inversion
Elevation and temperature data for a place are tabulated below:$$\begin{array}{|c|c|} \hline \text{Elevation, m} & \text{Temperature, } ^{\circ}C \\ \hline 4 & 21.25 \\ \...
Milicevic3306
11.9k
points
Milicevic3306
asked
Mar 25, 2018
Construction Materials and Management
gate2013-ce
rate-analysis
construction-materials-and-management
structural-engineering
+
–
0
votes
0
answers
32
GATE Civil 2012 | Question: 6
If a small concrete cube is submerged deep in still water in such a way that the pressure exerted on all faces of the cube is $p$, then the maximum shear stress developed inside the cube is $0$ $\dfrac{p}{2}$ $p$ $2p$
If a small concrete cube is submerged deep in still water in such a way that the pressure exerted on all faces of the cube is $p$, then the maximum shear stress developed...
Milicevic3306
11.9k
points
Milicevic3306
asked
Mar 25, 2018
Construction Materials and Management
gate2012-ce
construction-materials-and-management
structural-engineering
concrete-cube
+
–
0
votes
0
answers
33
GATE2018 CE-2: 5
The setting time of cement is determined using Le Chatelier apparatus Briquette testing apparatus Vicat apparatus Casagrande's apparatus
The setting time of cement is determined usingLe Chatelier apparatusBriquette testing apparatusVicat apparatusCasagrande's apparatus
gatecse
4.0k
points
gatecse
asked
Feb 17, 2018
Construction Materials and Management
gate2018-ce-2
structural-engineering
construction-materials-and-management
setting-time-of-cement
+
–
0
votes
0
answers
34
GATE2018 CE-1: 44
At a construction site, a contractor plans to make an excavation as shown in the figure. The water level in the adjacent river is at an elevation of $+20.0$ m. Unit weight of water is $10 \: kn/m^3$. The factor of safety (up to two decimal places) against sand boiling for the proposed excavation is ___________
At a construction site, a contractor plans to make an excavation as shown in the figure.The water level in the adjacent river is at an elevation of $+20.0$ m. Unit weight...
gatecse
4.0k
points
gatecse
asked
Feb 17, 2018
Construction Materials and Management
gate2018-ce-1
numerical-answers
construction-materials-and-management
structural-engineering
construction-contracts
+
–
To see more, click for the
full list of questions