GATE Civil 2024 Set 2 | Question: 31
A round-bottom triangular lined canal is to be laid at a slope of $1$ in $1500$, to carry a discharge of $25 \mathrm{~m}^{3} / \mathrm{s}$. The side slopes of the canal cross-section are to be kept at $1.25 \mathrm{H}: 1 \mathrm{~V}$. If Manning's roughness ... be in the range of $2.39$ to $2.42$ $1.94$ to $1.97$ $2.24$ to $2.27$ $2.61$ to $2.64$
A round-bottom triangular lined canal is to be laid at a slope of $1$ in $1500$, to carry a discharge of $25 \mathrm{~m}^{3} / \mathrm{s}$. The side slopes of the canal c...
Arjun
13.0k
points
Arjun
asked
Feb 16
Others
gatecivil-2024-set2
+
–
0
votes
0
answers
42
GATE Civil 2024 Set 2 | Question: 32
A hypothetical multimedia filter, consisting of anthracite particles (specific gravity: $1.50$), silica sand (specific gravity: $2.60$), and ilmenite sand (specific gravity: $4.20$), is to be designed for treating water/wastewater. After backwashing, the ... than $0.64 \mathrm{~mm}$ and diameter of ilmenite particles is slightly less than $0.10 \mathrm{~mm}$.
A hypothetical multimedia filter, consisting of anthracite particles (specific gravity: $1.50$), silica sand (specific gravity: $2.60$), and ilmenite sand (specific gravi...
Arjun
13.0k
points
Arjun
asked
Feb 16
Others
gatecivil-2024-set2
+
–
0
votes
0
answers
43
GATE Civil 2024 Set 2 | Question: 33
The consolidated data of a spot speed study for a certain stretch of a highway is given in the table. Speed range $(\mathrm{kmph})$ Number of observations $0-10$ $7$ $10-20$ $31$ $20-30$ $76$ $30-40$ $129$ $40-50$ $104$ $50-60$ $78$ ... $13$ $90-100$ $9$ The "upper speed limit" (in $\mathrm{kmph}$) for the traffic sign is $50$ $55$ $65$ $70$
The consolidated data of a spot speed study for a certain stretch of a highway is given in the table.Speed range $(\mathrm{kmph})$Number of observations...
Arjun
13.0k
points
Arjun
asked
Feb 16
Others
gatecivil-2024-set2
+
–
0
votes
0
answers
44
GATE Civil 2024 Set 2 | Question: 34
Three vectors $\overrightarrow{\mathrm{p}}, \overrightarrow{\mathrm{q}}$, and $\overrightarrow{\mathrm{r}}$ are given as \[ \begin{array}{c} \overrightarrow{\mathrm{p}}=\hat{\imath}+\hat{\jmath}+\hat{k} \\ \overrightarrow{\mathrm ...
Three vectors $\overrightarrow{\mathrm{p}}, \overrightarrow{\mathrm{q}}$, and $\overrightarrow{\mathrm{r}}$ are given as\[\begin{array}{c}\overrightarrow{\mathrm{p}}=\hat...
Arjun
13.0k
points
Arjun
asked
Feb 16
Others
gatecivil-2024-set2
+
–
0
votes
0
answers
45
GATE Civil 2024 Set 2 | Question: 35
Consider the statements $\text{P, Q,}$ and $\text{R}$. $\text{P}$: Compacted fine-grained soils with flocculated structure have isotropic permeability. $\text{Q}$ ... is TRUE $\mathrm{P}$ is TRUE and $\mathrm{R}$ is FALSE Both $\mathrm{Q}$ and $\mathrm{R}$ are FALSE
Consider the statements $\text{P, Q,}$ and $\text{R}$.$\text{P}$: Compacted fine-grained soils with flocculated structure have isotropic permeability.$\tex...
Arjun
13.0k
points
Arjun
asked
Feb 16
Others
gatecivil-2024-set2
+
–
0
votes
0
answers
46
GATE Civil 2024 Set 2 | Question: 36
In the context of pavement material characterization, the CORRECT statement(s) is/are The load penetration curve of $\text{CBR}$ test may need origin correction due to the non-vertical penetrating plunger of the loading machine. The toughness and hardness of ... total volume of air voids $\left(V_{v}\right)$ and total volume of bitumen $\left(V_{b}\right)$.
In the context of pavement material characterization, the CORRECT statement(s) is/areThe load penetration curve of $\text{CBR}$ test may need origin correctio...
Arjun
13.0k
points
Arjun
asked
Feb 16
Others
gatecivil-2024-set2
+
–
0
votes
0
answers
47
GATE Civil 2024 Set 2 | Question: 37
The expression for computing the effective interest rate $\left(i_{\text {eff }}\right)$ using continuous compounding for a nominal interest rate of $5 \%$ is \[ i_{\text {eff }}=\lim _{m \rightarrow \infty}\left(1+\frac{0.05}{m}\right)^{m}-1 \] The effective interest rate (in percentage) is $\_\_\_\_\_\_$ (rounded off to $2$ decimal places).
The expression for computing the effective interest rate $\left(i_{\text {eff }}\right)$ using continuous compounding for a nominal interest rate of $5 \%$ is\[i_{\text {...
Arjun
13.0k
points
Arjun
asked
Feb 16
Others
gatecivil-2024-set2
numerical-answers
+
–
0
votes
0
answers
48
GATE Civil 2024 Set 2 | Question: 38
Consider two matrices $\mathbf{A}=\left[\begin{array}{lll}2 & 1 & 4 \\ 1 & 0 & 3\end{array}\right]$ and $\mathbf{B}=\left[\begin{array}{cc}-1 & 0 \\ 2 & 3 \\ 1 & 4\end{array}\right]$. The determinant of the matrix $\mathbf{AB}$ is $\_\_\_\_\_\_\_$ (in integer).
Consider two matrices $\mathbf{A}=\left[\begin{array}{lll}2 & 1 & 4 \\ 1 & 0 & 3\end{array}\right]$ and $\mathbf{B}=\left[\begin{array}{cc}-1 & 0 \\ 2 & 3 \\ 1 & 4\end{ar...
Arjun
13.0k
points
Arjun
asked
Feb 16
Others
gatecivil-2024-set2
numerical-answers
+
–
0
votes
0
answers
49
GATE Civil 2024 Set 2 | Question: 39
For the $6 \mathrm{~m}$ long horizontal cantilever beam $\mathrm{PQR}$ shown in the figure, $\mathrm{Q}$ is the midpoint. Segment $\mathrm{PQ}$ of the beam has flexural rigidity $\mathrm{EI}=2 \times 10^{5} \mathrm{kN. \textrm {m } ^ { 2 }}$ whereas the ... (in $\mathrm{mm}$ ) at point $\mathrm{Q}$ is $\_\_\_\_\_\_\_$ (rounded off to $3$ decimal places).
For the $6 \mathrm{~m}$ long horizontal cantilever beam $\mathrm{PQR}$ shown in the figure, $\mathrm{Q}$ is the midpoint. Segment $\mathrm{PQ}$ of the beam has flexural r...
Arjun
13.0k
points
Arjun
asked
Feb 16
Others
gatecivil-2024-set2
numerical-answers
+
–
0
votes
0
answers
50
GATE Civil 2024 Set 2 | Question: 40
The horizontal beam $\mathrm{PQRS}$ shown in the figure has a fixed support at point $\mathrm{P}$, an internal hinge at point $Q$, and a pin support at point $R$. A concentrated vertically downward load $(V)$ of $10 \mathrm{kN}$ can act at any point over the ... $\mathrm{P}$ due to $V$ is $\_\_\_\_\_\_$ (in integer).
The horizontal beam $\mathrm{PQRS}$ shown in the figure has a fixed support at point $\mathrm{P}$, an internal hinge at point $Q$, and a pin support at point $R$. A conce...
Arjun
13.0k
points
Arjun
asked
Feb 16
Others
gatecivil-2024-set2
numerical-answers
+
–
0
votes
0
answers
51
GATE Civil 2024 Set 2 | Question: 41
A concrete column section of size $300 \mathrm{~mm} \times 500 \mathrm{~mm}$ as shown in the figure is subjected to both axial compression and bending along the major axis. The depth of the neutral axis $\left(x_{u}\right)$ is $1.1$ times the depth of the ... tension in the section, is $\_\_\_\_\_\_\_$ $\times 10^{-3}$ (rounded off to $2$ decimal places).
A concrete column section of size $300 \mathrm{~mm} \times 500 \mathrm{~mm}$ as shown in the figure is subjected to both axial compression and bending along the major axi...
Arjun
13.0k
points
Arjun
asked
Feb 16
Others
gatecivil-2024-set2
numerical-answers
+
–
0
votes
0
answers
52
GATE Civil 2024 Set 2 | Question: 42
The table shows the activities and their durations and dependencies in a project. \begin{array}{|c|c|c|} \hline \text{Activity} & \text{Duration (Days)} & \text{Depends on} \\ \hline \text{A} & 8 & - \\ \hline \text{B} & 4 & \text{ ... , K} \\ \hline \end{array} The total duration (in days) of the project is $\_\_\_\_\_\_\_$ (in integer).
The table shows the activities and their durations and dependencies in a project.\begin{array}{|c|c|c|}\hline \text{Activity} & \text{Duration (Days)} & \text{Depends on}...
Arjun
13.0k
points
Arjun
asked
Feb 16
Others
gatecivil-2024-set2
numerical-answers
+
–
0
votes
0
answers
53
GATE Civil 2024 Set 2 | Question: 43
A homogeneous earth dam has a maximum water head difference of $15 \mathrm{~m}$ between the upstream and downstream sides. A flownet was drawn with the number of potential drops as 10 and the average length of the element as $3 \mathrm{~m}$. Specific gravity of the ... failure, void ratio of the soil is $\_\_\_\_\_\_\_\_\_$ (rounded off to $2$ decimal places).
A homogeneous earth dam has a maximum water head difference of $15 \mathrm{~m}$ between the upstream and downstream sides. A flownet was drawn with the number of potentia...
Arjun
13.0k
points
Arjun
asked
Feb 16
Others
gatecivil-2024-set2
numerical-answers
+
–
0
votes
0
answers
54
GATE Civil 2024 Set 2 | Question: 44
The in-situ percentage of voids of a sand deposit is $50 \%$. The maximum and minimum densities of sand determined from the laboratory tests are $1.8 \mathrm{~g} / \mathrm{cm}^{3}$ and $1.3 \mathrm{~g} / \mathrm{cm}^{3}$, respectively. Assume the ... $\_\_\_\_\_\_\_$ (rounded off to $2$ decimal places).
The in-situ percentage of voids of a sand deposit is $50 \%$. The maximum and minimum densities of sand determined from the laboratory tests are $1.8 \mathrm{~g} / \mathr...
Arjun
13.0k
points
Arjun
asked
Feb 16
Others
gatecivil-2024-set2
numerical-answers
+
–
0
votes
0
answers
55
GATE Civil 2024 Set 2 | Question: 45
A drained triaxial test was conducted on a saturated sand specimen using a stress-path triaxial testing system. The specimen failed when the axial stress reached a value of $100 \mathrm{kN} / \mathrm{m}^{2}$ ... (in degrees) with respect to horizontal is $\_\_\_\_\_\_\_\_$ (rounded off to the nearest integer).
A drained triaxial test was conducted on a saturated sand specimen using a stress-path triaxial testing system. The specimen failed when the axial stress reached a value ...
Arjun
13.0k
points
Arjun
asked
Feb 16
Others
gatecivil-2024-set2
numerical-answers
+
–
0
votes
0
answers
56
GATE Civil 2024 Set 2 | Question: 46
A storm with a recorded precipitation of $11.0 \mathrm{~cm}$, as shown in the table, produced a direct run-off of $6.0 \mathrm{~cm}$. Time from start (hours) $1$ $2$ $3$ $4$ $5$ $6$ $7$ $8$ Recorded cumulative precipitation$(\mathrm{cm})$ $0.5$ ... $\_\_\_\_\_\_\_\_$ $\mathrm{cm} / \mathrm{hr}$ (rounded off to $2$ decimal places).
A storm with a recorded precipitation of $11.0 \mathrm{~cm}$, as shown in the table, produced a direct run-off of $6.0 \mathrm{~cm}$.Time from start (hours)$1$$2$$3$$4$$5...
Arjun
13.0k
points
Arjun
asked
Feb 16
Others
gatecivil-2024-set2
numerical-answers
+
–
0
votes
0
answers
57
GATE Civil 2024 Set 2 | Question: 47
A $500 \mathrm{~m}$ long water distribution pipeline $\text{P}$ with diameter $1.0 \mathrm{~m}$, is used to convey $0.1 \mathrm{~m}^{3} / \mathrm{s}$ of flow. A new pipeline $\text{Q}$ ... respectively. The diameter of the pipeline $\text{Q}$ (in meters) is $\_\_\_\_\_\_$ (rounded off to $2$ decimal places).
A $500 \mathrm{~m}$ long water distribution pipeline $\text{P}$ with diameter $1.0 \mathrm{~m}$, is used to convey $0.1 \mathrm{~m}^{3} / \mathrm{s}$ of flow. A new pipel...
Arjun
13.0k
points
Arjun
asked
Feb 16
Others
gatecivil-2024-set2
numerical-answers
+
–
0
votes
0
answers
58
GATE Civil 2024 Set 2 | Question: 48
A $2 \mathrm{~m} \times 1.5 \mathrm{~m}$ tank of $6 \mathrm{~m}$ height is provided with a $100 \mathrm{~mm}$ diameter orifice at the center of its base. The orifice is plugged and the tank is filled up to $5 \mathrm{~m}$ height. Consider the ... to $3.5 \mathrm{~m}$ under free discharge condition is $\_\_\_\_\_\_\_\_$ (rounded off to $2$ decimal places).
A $2 \mathrm{~m} \times 1.5 \mathrm{~m}$ tank of $6 \mathrm{~m}$ height is provided with a $100 \mathrm{~mm}$ diameter orifice at the center of its base. The orifice is p...
Arjun
13.0k
points
Arjun
asked
Feb 16
Others
gatecivil-2024-set2
numerical-answers
+
–
0
votes
0
answers
59
GATE Civil 2024 Set 2 | Question: 49
A rectangular channel is $4.0 \mathrm{~m}$ wide and carries a discharge of $2.0 \mathrm{~m}^{3} / \mathrm{s}$ with a depth of $0.4 \mathrm{~m}$. The channel transitions to a maximum width contraction at a downstream location, without influencing the ... . The width (in meters) at the maximum contraction is $\_\_\_\_\_\_\_$ (rounded off to $2$ decimal places).
A rectangular channel is $4.0 \mathrm{~m}$ wide and carries a discharge of $2.0 \mathrm{~m}^{3} / \mathrm{s}$ with a depth of $0.4 \mathrm{~m}$. The channel transitions t...
Arjun
13.0k
points
Arjun
asked
Feb 16
Others
gatecivil-2024-set2
numerical-answers
+
–
0
votes
0
answers
60
GATE Civil 2024 Set 2 | Question: 50
A circular settling tank is to be designed for primary treatment of sewage at a flow rate of $10$ million liters/day. Assume a detention period of $2.0$ hours and surface loading rate of $40000$ liters $/ \mathrm{m}^{2} /$ day. The height (in meters) of the water column in the tank is $\_\_\_\_\_\_\_$ (rounded off to $2$ decimal places).
A circular settling tank is to be designed for primary treatment of sewage at a flow rate of $10$ million liters/day. Assume a detention period of $2.0$ hours and surface...
Arjun
13.0k
points
Arjun
asked
Feb 16
Others
gatecivil-2024-set2
numerical-answers
+
–
0
votes
0
answers
61
GATE Civil 2024 Set 2 | Question: 51
An organic waste is represented as $\mathrm{C}_{240} \mathrm{O}_{200} \mathrm{H}_{180} \mathrm{~N}_{5} \mathrm{~S}$. (Atomic weights: $\mathrm{S}-32, \mathrm{H}-1, \mathrm{C}-12, \mathrm{O}-16, \mathrm{~N}-14$ ... $\mathrm{kg}$ of this waste is $\_\_\_\_\_\_\_$ (rounded off to $1$ decimal place).
An organic waste is represented as $\mathrm{C}_{240} \mathrm{O}_{200} \mathrm{H}_{180} \mathrm{~N}_{5} \mathrm{~S}$.(Atomic weights: $\mathrm{S}-32, \mathrm{H}-1, \mathrm...
Arjun
13.0k
points
Arjun
asked
Feb 16
Others
gatecivil-2024-set2
numerical-answers
+
–
0
votes
0
answers
62
GATE Civil 2024 Set 2 | Question: 52
A horizontal curve of radius $1080 \mathrm{~m}$ (with transition curves on either side) in a Broad Gauge railway track is designed and constructed for an equilibrium speed of $70 \mathrm{kmph}$. However, a few years after construction, the Railway Authorities ... the express trains running on this track is $\_\_\_\_\_\_\_$ (rounded off to the nearest integer).
A horizontal curve of radius $1080 \mathrm{~m}$ (with transition curves on either side) in a Broad Gauge railway track is designed and constructed for an equilibrium spee...
Arjun
13.0k
points
Arjun
asked
Feb 16
Others
gatecivil-2024-set2
numerical-answers
+
–
0
votes
0
answers
63
GATE Civil 2024 Set 2 | Question: 53
A vertical summit curve on a freight corridor is formed at the intersection of two gradients, $+3.0 \%$ and $-5.0 \%$. Assume the following: Only large-sized trucks are allowed on this corridor Design speed $=80 \mathrm{kmph}$ Eye height of truck drivers ... ) to accommodate the stopping sight distance is $\_\_\_\_\_\_\_\_\_$ (rounded off to $2$ decimal places).
A vertical summit curve on a freight corridor is formed at the intersection of two gradients, $+3.0 \%$ and $-5.0 \%$.Assume the following:Only large-sized trucks are all...
Arjun
13.0k
points
Arjun
asked
Feb 16
Others
gatecivil-2024-set2
numerical-answers
+
–
0
votes
0
answers
64
GATE Civil 2024 Set 2 | Question: 54
A child walks on a level surface from point $\text{P}$ to point $\text{Q}$ at a bearing of $30^{\circ}$, from point $\mathrm{Q}$ to point $\mathrm{R}$ at a bearing of $90^{\circ}$ ... degrees, the straight-line path length $\text{RP}$ (in meters) is $\_\_\_\_\_\_\_$ (rounded off to the nearest integer).
A child walks on a level surface from point $\text{P}$ to point $\text{Q}$ at a bearing of $30^{\circ}$, from point $\mathrm{Q}$ to point $\mathrm{R}$ at a bearing of $90...
Arjun
13.0k
points
Arjun
asked
Feb 16
Others
gatecivil-2024-set2
numerical-answers
+
–
0
votes
0
answers
65
GATE Civil 2024 Set 2 | Question: 55
Differential levelling is carried out from point $\text{P(B M}:+200.000 \mathrm{~m})$ to point $\text{R}$. The readings taken are given in the table. Points Staff readings (m) Remarks Back Sight Fore Sight P $(-) 2.050$ BM: $+200.000 \mathrm{~m}$ ... Level (in meters) of the point $\mathrm{R}$ is $\_\_\_\_\_\_\_\_$ (rounded off to $3$ decimal places).
Differential levelling is carried out from point $\text{P(B M}:+200.000 \mathrm{~m})$ to point $\text{R}$. The readings taken are given in the table.PointsStaff readings ...
Arjun
13.0k
points
Arjun
asked
Feb 16
Others
gatecivil-2024-set2
numerical-answers
+
–
Page:
« prev
1
2
GO Civil
Email or Username
Show
Hide
Password
I forgot my password
Remember
Log in
Register