0 votes 0 votes For routing of flood in a given channel using the Muskingum method, two of the routing coefficients are estimated as $C_0=-0.25$ and $C_1=0.55$. The value of the third coefficient $C_2$ would be ____ Hydrology gate2018-ce-1 numerical-answers hydrology water-resources-engineering flood-estimation-and-routing muskingum-method + – gatecse asked Feb 17, 2018 • retagged May 22, 2021 by Chandanachandu gatecse 4.0k points answer See all 0 reply