An irrigation canal is to be designed to deliver $10$ cumec to meet the peak demand of $7500$ hectare of cropped area. The estimated canal losses are $50 \%$ of the head discharge. The duty (in hectare/cumec) on capacity of this canal is
- $375$
- $1125$
- $1500$
- $1875$