For a clayey soil stratum, the time required for degree of consolidation from $25 \%$ to $50 \%$ is $30$ days.
The total time (in days) required for $90 \%$ degree of consolidation of the same soil stratum is $\_\_\_\_$ (rounded off to the nearest integer).