Most viewed questions in Transportation Engineering
0
votes
0
answers
81
GATE2020-CE-1-32
The relationship between traffic flow rate (q) and density (D) is shown in the figure The shock wave condition is depicted by flow with respect to point $1\:(q_1=q_{max})$ flow changing from point $2$ to point $6\:(q_2>q_6)$ flow changing from point $3$ to point $7\:(q_3<q_7)$ flow with respect to point $4$ and point $5\:(q_4=q_5)$
The relationship between traffic flow rate (q) and density (D) is shown in the figure The shock wave condition is depicted byflow with respect to point $1\:(q_1=q_{max})$...
go_editor
5.3k
points
go_editor
asked
Feb 27, 2020
Transportation Engineering
gate2020-ce-1
transportation-engineering
traffic-engineering
+
–
0
votes
0
answers
82
GATE2018 CE-1: 16
A well-designed signalized intersection is one in which the crossing conflicts are increased total delay is minimized cycle time is equal to the sum of red and green times in all phases cycle time is equal to the sum of red and yellow times in all phases
A well-designed signalized intersection is one in which thecrossing conflicts are increasedtotal delay is minimizedcycle time is equal to the sum of red and green times i...
gatecse
4.0k
points
gatecse
asked
Feb 17, 2018
Traffic Engineering
gate2018-ce-1
traffic-engineering
transportation-engineering
signal-design
+
–
0
votes
0
answers
83
GATE Civil 2021 Set 1 | Question: 54
The longitudinal section of a runway provides the following data: $\begin{array}{|lc|cI|}\hline &\textbf{End-to-end runway $\textbf{(m)}$} & \textbf{Gradient $ ... $\%$, $\textit{round off to two decimal places}$) is ________________
The longitudinal section of a runway provides the following data:$$\begin{array}{|lc|cI|}\hline&\textbf{End-to-end runway $\textbf{(m)}$} & \textbf{Gradient $(\%)$} \\ \...
Arjun
13.0k
points
Arjun
asked
Feb 19, 2021
Transportation Infrastructure
gatecivil-2021-set1
numerical-answers
concept-of-airport-runway
effective-gradient
+
–
0
votes
0
answers
84
GATE2015-1-22
The penetration value of a bitumen sample tested at $25^{\circ}C$ is $80$. When this sample is heated to $60^{\circ}C$ and tested again, the needle of the penetration test apparatus penetrates the bitumen sample by $d$ mm. The value of $d$ CANNOT be less than ______ mm.
The penetration value of a bitumen sample tested at $25^{\circ}C$ is $80$. When this sample is heated to $60^{\circ}C$ and tested again, the needle of the penetration tes...
Milicevic3306
11.9k
points
Milicevic3306
asked
Mar 26, 2018
Highway Pavements
gate2015-ce-1
numerical-answers
transportation-engineering
highway-pavements
desirable-properties-of-bitumen
tests-on-bitumen
+
–
0
votes
0
answers
85
GATE2020 CE-2-45
The design speed of a two-lane two-way road is $60\: km/h$ and the longitudinal coefficient of friction is $0.36$. The reaction time of a driver is $2.5$ seconds. Consider acceleration due to gravity as $9.8 m/s^2$. The intermediate sight distance (in $m,$ round off to the nearest integer) required for the road is ________.
The design speed of a two-lane two-way road is $60\: km/h$ and the longitudinal coefficient of friction is $0.36$. The reaction time of a driver is $2.5$ seconds. Conside...
go_editor
5.3k
points
go_editor
asked
Feb 13, 2020
Transportation Infrastructure
gate2020-ce-2
numerical-answers
geometric-design-of-highways
+
–
0
votes
0
answers
86
GATE2014-2-23
The average spacing between vehicles in a traffic stream is $50$ m, then the density (in veh/km) of the stream is _______
The average spacing between vehicles in a traffic stream is $50$ m, then the density (in veh/km) of the stream is _______
Milicevic3306
11.9k
points
Milicevic3306
asked
Mar 25, 2018
Traffic Engineering
gate2014-ce-2
numerical-answers
traffic-engineering
transportation-engineering
traffic-stream
+
–
0
votes
0
answers
87
GATE2014-1-51
The perception-reaction time for a vehicle travelling at $90$ km/h, given the coefficient of longitudinal friction of $0.35$ and the stopping sight distance of $170$ m (assume $g=9.81 \: m/s^2$), is _____ seconds.
The perception-reaction time for a vehicle travelling at $90$ km/h, given the coefficient of longitudinal friction of $0.35$ and the stopping sight distance of $170$ m (a...
Milicevic3306
11.9k
points
Milicevic3306
asked
Mar 25, 2018
Transportation Infrastructure
gate2014-ce-1
numerical-answers
transportation-engineering
transportation-infrastructure
sight-distances
+
–
0
votes
0
answers
88
GATE Civil 2021 Set 1 | Question: 15
A highway designed for $\text{80 km/h}$ speed has a horizontal curve section with radius $\text{250 m}$. If the design lateral friction is assumed to develop fully, the required super elevation is $0.02$ $0.05$ $0.07$ $0.09$
A highway designed for $\text{80 km/h}$ speed has a horizontal curve section with radius $\text{250 m}$. If the design lateral friction is assumed to develop fully, the r...
Arjun
13.0k
points
Arjun
asked
Feb 19, 2021
Transportation Infrastructure
gatecivil-2021-set1
geometric-design-of-highways
horizontal-curves
+
–
0
votes
0
answers
89
GATE2017 CE-1: 34
The radius of a horizontal circular curve on a highway is $120$ m. The design speed is $60$ km/hour, and the design coefficient of lateral friction between the tyre and road surface is $0.15$. The estimated value of superrelevation required (if full lateral friction is assumed to develop), and the ... $\dfrac{1}{11.6} \text{ and } 0.24 \\$ $\dfrac{1}{12.9} \text{ and } 0.24$
The radius of a horizontal circular curve on a highway is $120$ m. The design speed is $60$ km/hour, and the design coefficient of lateral friction between the tyre and r...
Milicevic3306
11.9k
points
Milicevic3306
asked
Mar 26, 2018
Traffic Engineering
gate2017-ce-1
traffic-engineering
transportation-engineering
traffic-studios-on-flow-and-speed
+
–
0
votes
0
answers
90
GATE Civil 2021 Set 1 | Question: 53
Spot speeds of vehicles observed at a point on a highway are $\text{40, 55, 60, 65 and 80 km/h}$. The space-mean speed (in $\text{km/h}$, $\textit{round off to two decimal places}$) of the observed vehicles is ___________________
Spot speeds of vehicles observed at a point on a highway are $\text{40, 55, 60, 65 and 80 km/h}$. The space-mean speed (in $\text{km/h}$, $\textit{round off to two decima...
Arjun
13.0k
points
Arjun
asked
Feb 19, 2021
Traffic Engineering
gatecivil-2021-set1
numerical-answers
traffic-studios-on-flow-and-speed
+
–
0
votes
0
answers
91
GATE2020-CE-1-45
Traffic volume count has been collected on a $2$-lane road section which needs upgradation due to severe traffic flow condition. Maximum service flow rate per lane is observed as $1280\:veh/h$ ... are Regular Commuters', the number of extra lane(s) (round off to the next higher integer) to be provided, is ______.
Traffic volume count has been collected on a $2$-lane road section which needs upgradation due to severe traffic flow condition. Maximum service flow rate per lane is obs...
go_editor
5.3k
points
go_editor
asked
Feb 27, 2020
Traffic Engineering
gate2020-ce-1
numerical-answers
peak-hour-factor
traffic-flow
+
–
0
votes
0
answers
92
GATE2016-1-21
During a forensic investigation of pavement failure, an engineer reconstructed the graphs P, Q, R, and S, using partial and damaged old reports. Theoretically plausible correct graphs according to the ‘Marshall mixture design output’ are P, Q, R P, Q, S Q, R, S R, S, P
During a forensic investigation of pavement failure, an engineer reconstructed the graphs P, Q, R, and S, using partial and damaged old reports.Theoretically plausible co...
Milicevic3306
11.9k
points
Milicevic3306
asked
Mar 27, 2018
Transportation Engineering
gate2016-ce-1
highway-pavement
transportation-engineering
pavement-failure
marshall-mixture
+
–
0
votes
0
answers
93
GATE2015-2-52
Match the information related to tests on aggregates given in Group - I with that in Group - II. ... $P - 4; Q - 1; R - 3; S - 2;$ $P - 3; Q - 4; R - 2; S - 1;$
Match the information related to tests on aggregates given in Group – I with that in Group – II.$\begin{array}{ll} \text{Group – I} & \text{Group – II} \\ P. \tex...
Milicevic3306
11.9k
points
Milicevic3306
asked
Mar 26, 2018
Transportation Engineering
gate2015-ce-2
transportation-engineering
highway-pavements
quality-control-tests
+
–
0
votes
0
answers
94
GATE2014-2-55
The chainage of the intersection point of two straight is $1585.60$ m and the angle of intersection is $140^{\circ}$. If the radius of a circular curve is $600.00$ m, the tangent distance (in m) and length of the curve (in m), respectively are $418.88$ and $1466.08$ $218.38$ and $1648.49$ $218.38$ and $418.88$ $418.88$ and $218.38$
The chainage of the intersection point of two straight is $1585.60$ m and the angle of intersection is $140^{\circ}$. If the radius of a circular curve is $600.00$ m, the...
Milicevic3306
11.9k
points
Milicevic3306
asked
Mar 25, 2018
Traffic Engineering
gate2014-ce-2
traffic-engineering
transportation-engineering
types-of-intersections
+
–
0
votes
0
answers
95
GATE2015-1-52
On a circular curve, the rate of superelevation is $e$. While negotiating the curve a vehicle comes to a stop. It is seen that the stopped vehicle does not slide inwards (in the radial direction). The coefficient of side friction is $f$. Which of the following is true: $e \leq f$ $f < e < 2f$ $e \geq 2f$ none of the above
On a circular curve, the rate of superelevation is $e$. While negotiating the curve a vehicle comes to a stop. It is seen that the stopped vehicle does not slide inwards ...
Milicevic3306
11.9k
points
Milicevic3306
asked
Mar 26, 2018
Traffic Engineering
gate2015-ce-1
transportation-engineering
traffic-engineering
accident-study
+
–
0
votes
0
answers
96
GATE2018 CE-1: 15
The speed-density relationship for a road section is shown in the figure. The shape of the flow-density relationship is piecewise linear parabolic initially linear than parabolic initially parabolic than linear
The speed-density relationship for a road section is shown in the figure.The shape of the flow-density relationship ispiecewise linearparabolicinitially linear than parab...
gatecse
4.0k
points
gatecse
asked
Feb 17, 2018
Transportation Infrastructure
gate2018-ce-1
transportation-engineering
speed-density-relationship
transportation-infrastructure
+
–
0
votes
0
answers
97
GATE2016-1-53
A two lane, one-way road with radius of $50$ m is predominantly carrying lorries with wheelbase of $5$ m. The speed of lorries is restricted to be between $60$ kmph and $80$ kmph. The mechanical widening and psychological widening required at $60$ kmph are designated as $w_{me,60}$ and $w_{ps,60}$, ... $1.19 \:m, 0.50 \:m, 0.89 \:m, \text{ and } 0.50 \:m$
A two lane, one-way road with radius of $50$ m is predominantly carrying lorries with wheelbase of $5$ m. The speed of lorries is restricted to be between $60$ kmph and $...
Milicevic3306
11.9k
points
Milicevic3306
asked
Mar 27, 2018
Transportation Infrastructure
gate2016-ce-1
transportation-engineering
transportation-infrastructure
geometric-design-of-highways
+
–
0
votes
0
answers
98
GATE2014-2-52
On a section of a highway the speed-density relationship is linear an is given by $v=\big[80 – \dfrac{2}{3}k\big]$; where $v$ is in km/h and $k$ is in veh/km. The capacity (in veh/h) of this section of the highway would be $1200$ $2400$ $4800$ $9600$
On a section of a highway the speed-density relationship is linear an is given by $v=\big[80 – \dfrac{2}{3}k\big]$; where $v$ is in km/h and $k$ is in veh/km. The capac...
Milicevic3306
11.9k
points
Milicevic3306
asked
Mar 25, 2018
Highway Pavements
gate2014-ce-2
highway-pavements
transportation-engineering
geometric-design-of-highways
+
–
0
votes
0
answers
99
GATE2020 CE-2-32
$\text{Group-I}$ gives a list of test methods for evaluating properties of aggregates. $\text{Group-II}$ ... $P-2; Q-1; R-4; S-3$ $P-3; Q-4; R-1; S-2$ $P-2; Q-4; R-3; S-1$
$\text{Group-I}$ gives a list of test methods for evaluating properties of aggregates. $\text{Group-II}$ gives the list of properties to be evaluated.$$\begin{array}{ll}\...
go_editor
5.3k
points
go_editor
asked
Feb 13, 2020
Transportation Engineering
gate2020-ce-2
test-methods-and-its-properties
transportation-engineering
+
–
0
votes
0
answers
100
GATE Civil 2021 Set 1 | Question: 35
On a road, the speed – density relationship of a traffic stream is given by $u=70-0.7k$ (where speed, $u$, is in $\text{km/h}$ and density, $k$ is in $\text{veh/km}$). At the capacity condition, the average time headway will be $0.5 \:s$ $1.0 \:s$ $1.6 \:s$ $2.1 \:s$
On a road, the speed – density relationship of a traffic stream is given by $u=70-0.7k$ (where speed, $u$, is in $\text{km/h}$ and density, $k$ is in $\text{veh/km}$). ...
Arjun
13.0k
points
Arjun
asked
Feb 19, 2021
Traffic Engineering
gatecivil-2021-set1
traffic-studios-on-flow-and-speed
+
–
0
votes
0
answers
101
GATE2014-2-53
A pre-timed four phase signal has critical lane flow rate for the first three phases as $200$, $187$ and $210$ veh/hr with saturation flow rate of $1800$ veh/hr/lane for al phases. The lost time is given as $4$ seconds for each phase. If the cycle length is $60$ seconds, the effective green time (in seconds) of the fourth phase is ________
A pre-timed four phase signal has critical lane flow rate for the first three phases as $200$, $187$ and $210$ veh/hr with saturation flow rate of $1800$ veh/hr/lane for ...
Milicevic3306
11.9k
points
Milicevic3306
asked
Mar 25, 2018
Traffic Engineering
gate2014-ce-2
numerical-answers
traffic-engineering
transportation-engineering
signal-design
+
–
0
votes
0
answers
102
GATE Civil 2021 Set 1 | Question: 25
A signalized intersection operates in two phases. The lost time is $3$ seconds per phase. The maximum ratios of approach flow to saturation flow for the two phases are $0.37$ and $0.40$. The optimum cycle length using the Webster's method (in seconds, round off to one decimal place) is ______________
A signalized intersection operates in two phases. The lost time is $3$ seconds per phase. The maximum ratios of approach flow to saturation flow for the two phases are $0...
Arjun
13.0k
points
Arjun
asked
Feb 19, 2021
Traffic Engineering
gatecivil-2021-set1
numerical-answers
signal-design
websters-method
+
–
0
votes
0
answers
103
GATE2014-1-23
The minimum value of $15$ minute peak hour factor on a section of a road is $0.10$ $0.20$ $0.25$ $0.33$
The minimum value of $15$ minute peak hour factor on a section of a road is$0.10$$0.20$$0.25$$0.33$
Milicevic3306
11.9k
points
Milicevic3306
asked
Mar 25, 2018
Traffic Engineering
gate2014-ce-1
traffic-engineering
transportation-engineering
peak-hour-factor
+
–