Recent questions tagged construction-materials-and-management

0 0 votes
0 0 answers
If the fineness modulus of a sample of fine aggregates is $4.3$, the mean size of the particles in the sample is between$150 \: \mu m$ and $300 \: \mu m$$300 \: \mu m$ an...
0 0 votes
0 0 answers
The characteristic compressive strength of concrete required in a project is $25 \: MPa$ and the standard deviation in the observed compressive strength expected at site ...
0 0 votes
0 0 answers
As per Indian standards for bricks, minimum acceptable compressive strength of any class of burnt clay bricks in dry state is$10.0 \text{ MPa}$$7.5 \text{ MPa}$$5.0 \text...
0 0 votes
0 0 answers
A construction project consists of twelve activities. The estimated duration (in days) required to complete each of the activities along with the corresponding network di...
0 0 votes
0 0 answers
The activity-on-arrow network of activities for a construction project is shown in the figure. The durations (expressed in days) of the activities are mentioned below in ...
0 0 votes
0 0 answers
Bull’s trench kiln is used in the manufacturing oflimecementbricksnone of these
0 0 votes
0 0 answers
The compound which is largely responsible for initial setting and early strength gain of Ordinary Portland Cement is$C_3A$$C_3S$$C_2S$$C_4AF$
0 0 votes
0 0 answers
The Optimistic Time (O), Most likely Time (M) and Pessimistic Time (P) (in days) of the activities in the critical path are given below in the format O – M – P.The expect...
0 0 votes
0 0 answers
The activity details of a project are given below:$$\begin{array}{|c|c|c|} \hline \text{Activity} & \text{Depends on} & \text{Duration (in days)} \\ \hline P & \dots & 6 ...
0 0 votes
0 0 answers
In Marshall method of mix design, the coarse aggregate, fine aggregate, fines and bitumen having respective values of specific gravity $2.60, 2.70, 2.65$ and $1.01$, are ...
0 0 votes
0 0 answers
Workability of concrete can be measured using slump, compaction factor and Vebe time. Consider the following statements for workability of concrete.As the slump increases...
0 0 votes
0 0 answers
In a Marshall sample, the bulk specific gravity of mix and aggregates are $2.324$ and $2.546$ respectively. The sample includes $5 \%$ of bitumen (by total weight of mix)...
0 0 votes
0 0 answers
The target mean strength $f_{cm}$ for concrete mix design obtained from the characteristic strength $f_{ck}$ and standard deviation $\sigma$, as defined in $IS:456-2000$,...
0 0 votes
0 0 answers
Elevation and temperature data for a place are tabulated below:$$\begin{array}{|c|c|} \hline \text{Elevation, m} & \text{Temperature, } ^{\circ}C \\ \hline 4 & 21.25 \\ \...
0 0 votes
0 0 answers
If a small concrete cube is submerged deep in still water in such a way that the pressure exerted on all faces of the cube is $p$, then the maximum shear stress developed...
0 0 votes
1 1 answer
A coal containing $2 \%$ sulfur is burned completely to ash in a brick kiln at a rate of $30$ kg/min. The sulfur content in the ash was found to be $6 \%$ of the initial ...
0 0 votes
0 0 answers
The setting time of cement is determined usingLe Chatelier apparatusBriquette testing apparatusVicat apparatusCasagrande's apparatus
0 0 votes
0 0 answers
At a construction site, a contractor plans to make an excavation as shown in the figure.The water level in the adjacent river is at an elevation of $+20.0$ m. Unit weight...